通用banner
your current location : Home >> News >> Industry News

Contact UsContact Us

Jiangsu kangdelong environmental protection Co., L

Address: No. 61, Fenghuang East Road, Hailing District, Taizhou City

Equipment sales: 13852655669 Ms. Sun

Solution: 13852060015 Mr. Huang

After-sales service: 0523-82256069

Mailbox: KDL@KANDEP.COM

website:

en.kandep.com


Introduction to installation of stacked screw sludge dehydrator

2021-03-23 01:35:33
a

After debugging, the stacked screw sludge dehydrator can run smoothly before leaving the factory, and the installation matters needing attention after arriving at the installation site. What should we pay attention to when installing? Now let our staff to give you a brief introduction of its related knowledge.

1. Check the assembly of the moving ring. The rings should not be too tight and can move.

2. Spindle debugging, screw shaft into the ring between, to ensure that there is no resistance, install the motor, start the motor, let the motor run for 10 minutes, make sure that the motor is not faulty.

3. Electric control cabinet, mixing tank motor operation debugging.

4. When the equipment is idling, check the rotation direction of the main shaft to ensure that the screw shaft rotates in the positive direction.

5, if it is a variable frequency motor, use the high frequency starting up to low frequency, adjust to one minute 1.5 turn. If it is a continuously variable speed motor, adjust it to low speed before leaving factory.


叠螺污泥脱水机厂家

What do you need to pay attention to when operating the stacked screw sludge dehydrator? Please keep in mind the eight important points of streamlining!

1. Before operation, be sure to be familiar with the manual of the screw stacking machine, and have the most basic understanding of the screw stacking machine.

2. Make sure the screw is flexible and usable.

3. Run for 3-5 minutes, check whether the devices are normal!

4. Check whether the capacity exceeds the upper limit set by the machine.

5. Pay attention to uniform distribution when dewatering sludge machine to prevent machine vibration!

6. During the operation of the sludge machine, do not use the brake device to avoid accidents!

7. The top cover of the machine should not be free of sundries!

8. If there is heating and slipping phenomenon on the clock blue tape of the slave equipment, stop immediately, check the greasy tape, and wipe it with alcohol or gasoline for reuse.



Recent browse:

Related products

Related news

CONTACT

Address: No. 61, Fenghuang East Road, Hailing District, Taizhou City

Equipment sales: 13852655669 Ms. Sun

Solution: 13852060015 Mr. Huang

After-sales service: 0523-82256069

Mailbox: KDL@KANDEP.COM

  • Mobile station
    Mobile station
  • the public
    the public
CopyRight @ 2020 Jiangsu kangdelong environmental protection Co., L Specializing in Stack screw type sludge dewatering machine price, stacked screw type sludge dewatering machine manufacturer, sludge dewatering complete equipment ,Welcome to inquire!
record number: 苏ICP备19051179号| service support: 新迈科技